Vehicular Bridge at the Passenger Terminal at El Dorado Airport
Owner: Consorcio Constructor Nuevo Dorado
Area: 13.530 M2
Length: 630 M
Date: 2012
Location: Bogotá, D.C.
Excavation and construction of substructure and superstructure in reinforced
concrete (prestressed concrete) for a curved vehicular bridge six-lane wide at the
Dorado International Airport.
Más proyectos
x
OTHER HIGHLIGHTED PROJECTS CIVIL WORKS AND BRIDGES