CIVIL WORKS AND BRIDGES

Highway Bridge at Pipiral – Bridge 7 Functional Unit 4 on the Bogotá-Villavicencio Highway
  • Owner: Consorcio Vial Andino - ConAndino
  • Area: 8.234 M2
  • Length: 713 M
  • Segment 1: 572 M (with spans up to 140 M) - Segmental balanced-cantilever method
  • Segment 2: 141 M (with spans of 50 M) - Span-by-span method
  • Date: 2019
  • Location: Vía Bogotá – Villavicencio
Design and construction of the substructure and prestressed concrete superstructure for Bridge 7 on the Bogota-Villavicencio Highway. The bridge has two structures: one constructed using a post-tensioned cast-in-place segmental balanced-cantilever method. This structure is supported by caissons 55 M deep and piers 64 M high. The other structure was constructed using a post-tensioned cast-in place span-by-span method.
#