CIVIL WORKS AND BRIDGES

Highway Bridge at Susumuco – Bridges 4 and 5 of Functional Unit 3 on the Bogotá-Villavicencio Highway
  • Owner: Consorcio Vial Andino - ConAndino
  • Area: 12.985 M2
  • Total length: 1.130 M
  • Section 1-Bridge 4: 200 M (with spans up to 100 M) - Successive Cantilevers
  • Section 2-Bridge 4: 150 M (with spans of 30 M on average) - Delta Beam System
  • Section 1-Bridge 5: 180 M (with spans up to 90 M) - Successive Cantilevers
  • Section 2-Bridge 5: 580 M (with spans up to 140 M) - Successive Cantilevers
  • Date: 2022
  • Location: Vía Bogotá – Villavicencio
Construction of the substructure and prestressed concrete superstructure for Bridges 4 and 5 of the Functional Unit 3 on the Bogota-Villavicencio Highway. This highway bridge includes four structures. Bridge 4 which has two segments, one constructed using a post-tensioned cast-in-place segmental balanced-cantilever method, and the other segment constructed using precast U beams; and Bridge 5 which also has two segments, one 180 M long and the other 580 M long, both constructed using a post-tensioned cast-in-place segmental balanced-cantilever method.
#