Construction of substructure and superstructure in reinforced concrete (prestressed concrete) of four vehicular bridges at sector 1A at the Highway Bogota-Villavicencio. Two bridges are built by using the Cast-in-Place Segmental Construction Method (including 24 M depth caissons and 26 M high piers) and two bridges are built using I-Beam construction.